Inspection Requirements
All construction or work for which a permit is required shall be inspected by the City Building Inspector. All work should remain accessible and exposed for inspection purposes until approved.
To schedule an inspection, please contact the Permit Clerk by calling 210-655-0022. Inspection requests require at least one day notice and called in before 4 p.m. When requesting an inspection, you must provide the permit number, job address, type of inspection, contact number and name.
Required Inspections (Based on Type of Work)
Type of Construction | Required Inspections |
---|
New construction | Building final Flatwork Frame Insulation Pre pour (foundation) Rough-in electrical Rough-in mechanical Rough-in plumbing Top out TOPS |
Mechanical | Final inspection Rough-in (if necessary) |
Plumbing | Final inspection Gas test (if necessary) Rough-in Sewer Top out Tunnel Tunnel Water heater |
Electrical | Rough-in final |
Roof | Final |
Accessory Building | final |
Foundation | Final engineer's report |
Irrigation | Final |
Fence | Final |
Remodel | Final
|